Project Case 2Ton WNS Dual Fuel Steam Boiler for Bangladesh Garment Factory4

Myanmar
6Ton DZL Biomass Steam Boiler Signed

After comparing numerous suppliers, our Myanmar client visited our factory to inspect our biomass boiler production capability, build quality and integrated heating solutions.

Project Overview

1
We thoroughly negotiated details including parameters of the 6t DZL biomass chain grate boiler, steam pressure, fuel compatibility, Myanmar local power conditions and emission requirements. Our engineers elaborated on combustion efficiency, dust removal and noise reduction supporting systems.
2
The client inspected our workshop personally, checking boiler welding, furnace design, smoke tube fabrication and pre-assembly processes, and verified material thickness and production standards on the spot.
3
Based on Myanmar’s fuel conditions and the factory’s steam demand, the client confirmed the purchase of 8 complete sets of 6-ton DZL biomass steam boilers.
4
Satisfied with our workmanship and one-stop heating service, the customer signed the contract successfully. The boilers have been manufactured, packed and shipped to Myanmar for official operation. We also agreed on long-term cooperation for future factory expansion orders.

Related Products

GET IN TOUCH

Ready to Get Started?
Fill the Form.

Our engineering and sales team will assess your inquiry and provide professional guidance, technical feasibility analysis and customized solutions.

Related Cases

VIEW MORE